{"id":426,"date":"2012-08-09T09:39:28","date_gmt":"2012-08-09T13:39:28","guid":{"rendered":"http:\/\/www.rjet.ca\/blog\/?p=426"},"modified":"2012-08-10T09:59:58","modified_gmt":"2012-08-10T13:59:58","slug":"bombardier-ready-to-begin-integrated-cseries-tests","status":"publish","type":"post","link":"https:\/\/www.rjet.ca\/blog\/2012\/08\/09\/bombardier-ready-to-begin-integrated-cseries-tests\/","title":{"rendered":"Bombardier ready to begin integrated CSeries tests"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-full wp-image-190\" title=\"Bombardier_logo\" src=\"http:\/\/www.rjet.ca\/blog\/wp-content\/uploads\/2012\/01\/bombardier_logo.jpg\" alt=\"Bombardier_logo\" width=\"196\" height=\"109\" \/>Bombardier will begin integrated CSeries testing towards the end of August in preparation for the program&#8217;s first flight which is scheduled for December 2012.<\/p>\n<p>The testing will be performed at the manufacturer&#8217;s\u00a0 CIASTA facility in Mirabel and at various component\u00a0 suppliers around the world. Certification of the CSeries program is expected to take 18 months in total.<\/p>\n<p>In various news reports, Bombardier has indicated that a delay in the program of between three to five months would not be unexpected, but remains confident in their projected first flight date.<\/p>\n<p>Bombardier has collected orders from several airlines and leasing companies and expects that upon first flight additional orders will appear. Bombardier is targeting Air Canada as a possible customer for the CSeries to replace the airline&#8217;s Embraer aircraft which it has indicated it may wish to replace in the near future due to pilot agreements.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Bombardier will begin integrated CSeries testing towards the end of August in preparation for the program&#8217;s first flight which is scheduled for December 2012. The testing will be performed at the manufacturer&#8217;s\u00a0 CIASTA facility in Mirabel and at various component\u00a0 suppliers around the world. Certification of the CSeries program is expected to take 18 months &hellip; <\/p>\n<p><a class=\"more-link btn\" href=\"https:\/\/www.rjet.ca\/blog\/2012\/08\/09\/bombardier-ready-to-begin-integrated-cseries-tests\/\">Continue reading<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6,5],"tags":[33,32,238,237],"class_list":["post-426","post","type-post","status-publish","format-standard","hentry","category-fleet-update","category-news","tag-bombardier","tag-c-series","tag-fleet-update","tag-news","item-wrap"],"_links":{"self":[{"href":"https:\/\/www.rjet.ca\/blog\/wp-json\/wp\/v2\/posts\/426","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.rjet.ca\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.rjet.ca\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.rjet.ca\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.rjet.ca\/blog\/wp-json\/wp\/v2\/comments?post=426"}],"version-history":[{"count":0,"href":"https:\/\/www.rjet.ca\/blog\/wp-json\/wp\/v2\/posts\/426\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.rjet.ca\/blog\/wp-json\/wp\/v2\/media?parent=426"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.rjet.ca\/blog\/wp-json\/wp\/v2\/categories?post=426"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.rjet.ca\/blog\/wp-json\/wp\/v2\/tags?post=426"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}