{"id":882,"date":"2013-07-17T12:46:19","date_gmt":"2013-07-17T16:46:19","guid":{"rendered":"http:\/\/www.rjet.ca\/blog\/?p=882"},"modified":"2013-07-17T12:46:19","modified_gmt":"2013-07-17T16:46:19","slug":"ilfc-firms-order-for-embraer-e2s","status":"publish","type":"post","link":"https:\/\/www.rjet.ca\/blog\/2013\/07\/17\/ilfc-firms-order-for-embraer-e2s\/","title":{"rendered":"ILFC firms order for Embraer E2s"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-full wp-image-883\" alt=\"ILFC Logo\" src=\"http:\/\/www.rjet.ca\/blog\/wp-content\/uploads\/2013\/07\/ILFC-logo.jpg\" width=\"177\" height=\"173\" \/>Embraer announced on July 17, 2013 that ILFC firmed an order for 50 Embraer E2 aircraft. The order is for 25 Embraer 190-E2s and 25 Embraer 195-E2s.<\/p>\n<p>ILFC originally announced a letter of intent at the Paris Air Show in June 213 and the order also has options for an additional 25 Embraer 190-E2s and 25 Embraer 195-E2s. Deliveries are expected to begin in 2018 and be completed by the end of 2023.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Embraer announced on July 17, 2013 that ILFC firmed an order for 50 Embraer E2 aircraft. The order is for 25 Embraer 190-E2s and 25 Embraer 195-E2s. ILFC originally announced a letter of intent at the Paris Air Show in June 213 and the order also has options for an additional 25 Embraer 190-E2s and &hellip; <\/p>\n<p><a class=\"more-link btn\" href=\"https:\/\/www.rjet.ca\/blog\/2013\/07\/17\/ilfc-firms-order-for-embraer-e2s\/\">Continue reading<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6,5,47],"tags":[122,37,35,238,199,237,241],"class_list":["post-882","post","type-post","status-publish","format-standard","hentry","category-fleet-update","category-news","category-orders","tag-embraer","tag-embraer-175","tag-embraer-190","tag-fleet-update","tag-ilfc","tag-news","tag-orders","item-wrap"],"_links":{"self":[{"href":"https:\/\/www.rjet.ca\/blog\/wp-json\/wp\/v2\/posts\/882","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.rjet.ca\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.rjet.ca\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.rjet.ca\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.rjet.ca\/blog\/wp-json\/wp\/v2\/comments?post=882"}],"version-history":[{"count":0,"href":"https:\/\/www.rjet.ca\/blog\/wp-json\/wp\/v2\/posts\/882\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.rjet.ca\/blog\/wp-json\/wp\/v2\/media?parent=882"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.rjet.ca\/blog\/wp-json\/wp\/v2\/categories?post=882"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.rjet.ca\/blog\/wp-json\/wp\/v2\/tags?post=882"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}